In April 2016 Manchester eScholar was replaced by the University of Manchester’s new Research Information Management System, Pure. In the autumn the University’s research outputs will be available to search and browse via a new Research Portal. Until then the University’s full publication record can be accessed via a temporary portal and the old eScholar content is available to search and browse via this archive.

Contract and Claim Prevention in Major Projects: a Study on Petrochemical Projects in Iran

Naimi, Mehdy

[Thesis]. Manchester, UK: The University of Manchester; 2013.

Access to files

Abstract

The construction industry is notorious all over the world for disputes and claims. In large scale projects these claims are often more frequent and more expensive. The contract is the legal frame work of the project and forms project culture, therefore is a logical starting point for any attempt in reducing project claims.This research initially intended to study the possibility of drafting a robust contract which can prevent claims in major projects, and the main characteristics of such contract. However a review of contract related theories (transaction cost economics, agent theory and relational contracting) revealed that there is no such thing as perfect contract; and that contracts are invariably incomplete and prone to formation of claims. Traditional management theory considers disputes in project as pathological and tries to prevent them. The development and use of standard forms of contract was an attempt to tackle the problem of claim in the construction project, yet today more than 50 standard forms are in use in the UK alone and the rate of claims is at its highest ever. Much of the literature introduces partnering as a panacea for the current plague of disputes and claims. However this idea is seriously challenged by some scholars. Complexity science maintains that projects are complex systems and conflict occurs naturally. Conflicts are neither good nor bad by themselves; however the system needs re-adjustment after such conflicts. Flexibility of contracts or error controlled regulation can enhance such readjustment measures in the system.To get first hand information about the nature of claims from practitioners in major projects different methods of data gathering have been used. Three case studies, a set of interviews and a questionnaire survey have been conducted. Using a grounded theory like approach some repeating patterns of forming claims in the oil, gas and petrochemical projects are identified. Considering that all data have been gathered from Iranian projects, Iranian national culture has also been studied. The research concludes that contracts cannot prevent claims no matter how well they are drafted; nevertheless a poorly drafted contract can cause dispute. Some areas for improvement have been identified in the Iranian oil, gas and petrochemical sectors. By analysing the data and studying standard contracts some suggestions are made. In practice, stake holders try to preserve flexibility and rearrange relationships to keep continuity of contract and complete their projects.

Bibliographic metadata

Type of resource:
Content type:
Form of thesis:
Type of submission:
Degree type:
Doctor of Philosophy
Degree programme:
PhD Management of Projects
Publication date:
Location:
Manchester, UK
Total pages:
339
Abstract:
The construction industry is notorious all over the world for disputes and claims. In large scale projects these claims are often more frequent and more expensive. The contract is the legal frame work of the project and forms project culture, therefore is a logical starting point for any attempt in reducing project claims.This research initially intended to study the possibility of drafting a robust contract which can prevent claims in major projects, and the main characteristics of such contract. However a review of contract related theories (transaction cost economics, agent theory and relational contracting) revealed that there is no such thing as perfect contract; and that contracts are invariably incomplete and prone to formation of claims. Traditional management theory considers disputes in project as pathological and tries to prevent them. The development and use of standard forms of contract was an attempt to tackle the problem of claim in the construction project, yet today more than 50 standard forms are in use in the UK alone and the rate of claims is at its highest ever. Much of the literature introduces partnering as a panacea for the current plague of disputes and claims. However this idea is seriously challenged by some scholars. Complexity science maintains that projects are complex systems and conflict occurs naturally. Conflicts are neither good nor bad by themselves; however the system needs re-adjustment after such conflicts. Flexibility of contracts or error controlled regulation can enhance such readjustment measures in the system.To get first hand information about the nature of claims from practitioners in major projects different methods of data gathering have been used. Three case studies, a set of interviews and a questionnaire survey have been conducted. Using a grounded theory like approach some repeating patterns of forming claims in the oil, gas and petrochemical projects are identified. Considering that all data have been gathered from Iranian projects, Iranian national culture has also been studied. The research concludes that contracts cannot prevent claims no matter how well they are drafted; nevertheless a poorly drafted contract can cause dispute. Some areas for improvement have been identified in the Iranian oil, gas and petrochemical sectors. By analysing the data and studying standard contracts some suggestions are made. In practice, stake holders try to preserve flexibility and rearrange relationships to keep continuity of contract and complete their projects.
Thesis main supervisor(s):
Thesis advisor(s):
Language:
en

Institutional metadata

University researcher(s):

Record metadata

Manchester eScholar ID:
uk-ac-man-scw:193069
Created by:
Naimi, Mehdy
Created:
24th April, 2013, 12:24:52
Last modified by:
Naimi, Mehdy
Last modified:
2nd May, 2018, 13:50:49

Can we help?

The library chat service will be available from 11am-3pm Monday to Friday (excluding Bank Holidays). You can also email your enquiry to us.