In April 2016 Manchester eScholar was replaced by the University of Manchester’s new Research Information Management System, Pure. In the autumn the University’s research outputs will be available to search and browse via a new Research Portal. Until then the University’s full publication record can be accessed via a temporary portal and the old eScholar content is available to search and browse via this archive.

New insights into the mechanism of load introduction into concrete-filled steel tubular column through shear connection

H, Mollazadeh M; C, Wang Y

Engineering Structures. 2014;75:139-151.

Access to files

Full-text and supplementary files are not available from Manchester eScholar. Full-text is available externally using the following links:

Full-text held externally

Abstract

This paper presents the results of an extensive numerical and analytical study to re-investigate the mechanism of load introduction into concrete-filled tubular column through shear connection. The new mechanism of load introduction revealed from this research indicates that the shear load from the connection is introduced through the column length above and within the connection. This is different from the currently assumed mechanism of load introduction from underneath the connection. In fact, a simple free-body diagram analysis would demonstrate that the currently assumed load introduction mechanism is not possible. The results of the numerical simulations also indicate that the load introduction length above the connection is unlimited and can be as long as the entire column height. Based on the new load introduction mechanism and the numerical simulation results, the maximum amount of load introduced into the concrete core can be calculated as the bond strength multiplying the entire steel tube/concrete core contact surface area for the entire column length above and including the connection. Under the new load introduction mechanism and using representative values of column dimensions and concrete cylinder strength, it has been demonstrated that complete load introduction can be achieved in almost all practical arrangements of concrete filled tubular construction.

Bibliographic metadata

Type of resource:
Content type:
Publication status:
Published
Publication type:
Published date:
Journal title:
ISSN:
Publisher:
Volume:
75
Start page:
139
End page:
151
Total:
12
Pagination:
139-151
Digital Object Identifier:
http://dx.doi.org/10.1016/j.engstruct.2014.06.002
Attached files embargo period:
Immediate release
Attached files release date:
27th January, 2015
Access state:
Active

Institutional metadata

University researcher(s):

Record metadata

Manchester eScholar ID:
uk-ac-man-scw:253864
Created by:
Wang, Yong
Created:
27th January, 2015, 15:15:09
Last modified by:
Wang, Yong
Last modified:
2nd November, 2015, 13:54:58

Can we help?

The library chat service will be available from 11am-3pm Monday to Friday (excluding Bank Holidays). You can also email your enquiry to us.